PreviousHomeNextPhotos from our Motorcycle trip in August, 2005. Click here to visit my home page.
Check out this MAP of our trip!

Picture #80 - Hoover Dam

Here is Shelly standing near the Hoover Dam gift shop. Power Installation of the Hoover Dam was completed in 1961. With the uprating completed in 1993, there are fifteen 178,000 horsepower, one 100,000 horsepower, and one 86,000 horsepower Francis-type vertical hydraulic turbines. There are thirteen 130,000 kilowatt, two 127,000 kilowatt, one 61,500 kilowatt, and one 68,500 kilowatt generators. All machines are operated at 60 cycles. There are also two 2,400 kilowatt station-service units driven by Pelton water wheels. These provide electrical energy for lights and for operating cranes, pumps, motors, compressors, and other electrical equipment within the dam and powerplant.


PreviousHomeNext

Index of pictures: [1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] [13] [14] [15] [16] [17] [18] [19] [20] [21] [22] [23] [24] [25] [26] [27] [28] [29] [30] [31] [32] [33] [34] [35] [36] [37] [38] [39] [40] [41] [42] [43] [44] [45] [46] [47] [48] [49] [50] [51] [52] [53] [54] [55] [56] [57] [58] [59] [60] [61] [62] [63] [64] [65] [66] [67] [68] [69] [70] [71] [72] [73] [74] [75] [76] [77] [78] [79] [80] [81] [82] [83] [84] [85] [86] [87] [88] [89] [90] [91] [92] [93] [94] [95] [96] [97] [98] [99] [100] [101] [102] [103] [104] [105] [106] [107] [108] [109] [110] [111]
Contact Wayne: wayne@wayneboyd.com
Mailing address:
Wayne and Charlotte Boyd
1327 Holbrook St.
Amarillo, TX 79118